IG-308-EN version 01; 03/06/2022
52
Recommended sequence of operations
General instructions
cgm
.3-huv system: Fully gas-insulated
medium-voltage switchgear
4.
Earthing switch opening operation. Insert the lever in
the S2 earthing actuating shaft, move the actuating
arm to the end and turn anti-clockwise.
Figure 5.43.
Lever turn detail
5.
Verify that the cubicle is in isolating position.
Figure 5.44.
Earthing switch opened
Содержание velatia cgm.3 system
Страница 75: ......