IG-308-EN version 01; 03/06/2022
38
Recommended sequence of operations
General instructions
cgm
.3-huv system: Fully gas-insulated
medium-voltage switchgear
5.4.6. Earthing operation from isolating position
1.
Move the actuating shaft access handle in the yellow
zone to its bottom position.
2. Closing operation:
Insert the lever in the earthing switch actuating shaft,
move the actuating arm to the end and turn clockwise
90º.
Figure 5.16.
Lever turn process
3.
Verify that the cubicle is in earthing position.
Figure 5.17.
Earthing switch closed
Содержание velatia cgm.3 system
Страница 75: ......