IG-308-EN version 01; 03/06/2022
53
General instructions
cgm
.3-huv system: Fully gas-insulated
medium-voltage switchgear
Recommended sequence of operations
Closing operation from isolating position
Initial conditions: S1 and S2 earthing switch open, circuit-
breaker open.
1.
Charge the springs by introducing the spring charging
lever in the spring charge shaft and turn until the
charged spring indicating relay changes status.
2.
Close the circuit-breaker by pressing "I" button, and
check the status indicating relay.
Figure 5.45.
Closing button detail
Opening operation from closed position
Initial conditions: circuit-breaker closed, earthing switch S2
open and springs charged.
1.
Open the circuit-breaker by pressing the "O" opening
button and check the status indicating relay.
Figure 5.46.
Opening button detail
2.
Check there is no voltage through the
ekor
.vpis or
ekor
.ivds unit.
Содержание velatia cgm.3 system