IG-308-EN version 01; 03/06/2022
70
Maintenance
General instructions
cgm
.3-huv system: Fully gas-insulated
medium-voltage switchgear
7.3. Preventive maintenance of models cgm
.3-huv-v
, cgm
.3-huv-lv
and cgm
.3-huv-rbv
The actuating mechanisms and other elements outside
the gas tank may require preventive maintenance; the
frequency of this maintenance depends on the existing
environmental conditions (harsh environments, dust,
extreme temperatures, etc.) and must be established in line
with the experience and responsibility of the installer.
Maintenance should be carried out every 5 years or
2000 operating cycles, unless the user, together with
Ormazabal
, considers otherwise based on the operating
conditions.
The recommended preventive maintenance sequence
is described in Operation Manual
MO-079
by
Ormazabal
.
Содержание velatia cgm.3 system
Страница 75: ......