G-8
STEP 3
TURNING SERVER POWER OFF
Turn off the power of the server in the following procedure:
1.
Schedule the jobs required to convert the server configuration for the tower model to that for the rack mount
model (if the server has already been used in the configuration for the tower model).
2.
Back up the important data saved in the server using the procedure defined by the server OS (if the server has
already been used in the configuration for the tower model).
IMPORTANT:
Before starting the conversion of the server configuration for the tower
model to that for the rack mount model (or vise versa), back up the important data saved in
the server.
3.
Set the server to the offline status using the procedure defined by the network OS (if the server has already
been used in the configuration for the tower model).
4.
Release the key lock on the front door and open the front door.
Содержание Express5800 140He
Страница 1: ... User s Guide Express5800 140He ...
Страница 2: ......
Страница 4: ...This page is intentionally left blank ...
Страница 18: ...x This page is intentionally left blank ...
Страница 38: ...2 8 Internal View 1 2 4 3 1 Power supply cage 2 Non hot plug PCI slot 3 Hot plug PCI slot 4 Fan bay ...
Страница 62: ...2 32 This page is intentionally left blank ...
Страница 199: ...6 23 Linux Enter the following command to start the program cd usr BmcOnlineUpdate BmcOnlineUpdate ...
Страница 201: ...6 25 Windows 2000 1 Select Setting Control Panel Add or Remove Programs 2 Click BmcOnlineUpdate ...
Страница 266: ...8 56 This page is intentionally left blank ...
Страница 336: ...B 6 This page is intentionally left blank ...
Страница 362: ...E 12 This page is left intentionally blank ...
Страница 378: ...G 12 ...
Страница 397: ......
Страница 398: ... ...