G-28
Checking Slide Installation Status and Fixing
1.
Push the server into the rack once to check the installation position.
NOTE:
Make sure that the four screw holes at the upper left and right sides on the front of
the server are fit to the core nuts. If the four positions are not fit at all, the slide rail
assembly or the core nuts may be installed incorrectly. If so, the adjacent units cannot be
installed without clearance. Confirm the installation positions and make the reinstallation
from the first step.
2.
Pull out or push the server into the rack for several times to confirm that the slides move smoothly.
3.
Connect the power cords and all interface cables to the server.
IMPORTANT:
When routing the cable, pay attention that the cables are not caught, bent,
or loose when sliding the server.
4.
Fix the server to the rack with four screws (B) and four washers (A) after making sure the positions of core
nuts.
Содержание Express5800 140He
Страница 1: ... User s Guide Express5800 140He ...
Страница 2: ......
Страница 4: ...This page is intentionally left blank ...
Страница 18: ...x This page is intentionally left blank ...
Страница 38: ...2 8 Internal View 1 2 4 3 1 Power supply cage 2 Non hot plug PCI slot 3 Hot plug PCI slot 4 Fan bay ...
Страница 62: ...2 32 This page is intentionally left blank ...
Страница 199: ...6 23 Linux Enter the following command to start the program cd usr BmcOnlineUpdate BmcOnlineUpdate ...
Страница 201: ...6 25 Windows 2000 1 Select Setting Control Panel Add or Remove Programs 2 Click BmcOnlineUpdate ...
Страница 266: ...8 56 This page is intentionally left blank ...
Страница 336: ...B 6 This page is intentionally left blank ...
Страница 362: ...E 12 This page is left intentionally blank ...
Страница 378: ...G 12 ...
Страница 397: ......
Страница 398: ... ...