G-4
Preparing for Mounting the Server on the Rack
This section describes the preparatory procedure required to install the server on a 19-inch rack.
The preparation consists of the following steps:
Step 1
Unpacking
Step 2
Preparing tools
Step 3
Turning server power off
Step 4
Removing components for tower model from server
Step 5
Installing rack conversion kit on server
IMPORTANT:
Before converting the server configuration for the tower model to that for
the rack mount model (or vice versa), always back up the important data.
To convert the server configuration for the rack mount model to that for
the tower model, follow the procedure reverse to that described in this
chapter
Store all the parts removed depending on the description in this chapter
carefully.
CAUTIONS
Always read "Notes on Use" at the top of the guide before starting the procedures described in this chapter.
The manuals attached to the server describe the notes on the server. Refer to the manuals also.
These notes are intended to protect personnel from danger. Never forget to read them.
The procedures in this chapter also include several notes.
Содержание Express5800 140He
Страница 1: ... User s Guide Express5800 140He ...
Страница 2: ......
Страница 4: ...This page is intentionally left blank ...
Страница 18: ...x This page is intentionally left blank ...
Страница 38: ...2 8 Internal View 1 2 4 3 1 Power supply cage 2 Non hot plug PCI slot 3 Hot plug PCI slot 4 Fan bay ...
Страница 62: ...2 32 This page is intentionally left blank ...
Страница 199: ...6 23 Linux Enter the following command to start the program cd usr BmcOnlineUpdate BmcOnlineUpdate ...
Страница 201: ...6 25 Windows 2000 1 Select Setting Control Panel Add or Remove Programs 2 Click BmcOnlineUpdate ...
Страница 266: ...8 56 This page is intentionally left blank ...
Страница 336: ...B 6 This page is intentionally left blank ...
Страница 362: ...E 12 This page is left intentionally blank ...
Страница 378: ...G 12 ...
Страница 397: ......
Страница 398: ... ...