G-22
STEP 2
MOUNTING SERVER ON RACK
1.
Lift the server to the height at which the slide rails are installed on the rack by at least four persons (or using a
lift).
2.
Engage the inner rails installed on the sides of the server with the slide rails. Then insert the server into the
rack.
When the servers are latched on the way, push the right and left release levers to release the lock. Insert the
server to the rack further.
Mating portion
Release lever
Bearing rail
Slide rail assembly
Plastic portions
Inner rail
Содержание Express5800 140He
Страница 1: ... User s Guide Express5800 140He ...
Страница 2: ......
Страница 4: ...This page is intentionally left blank ...
Страница 18: ...x This page is intentionally left blank ...
Страница 38: ...2 8 Internal View 1 2 4 3 1 Power supply cage 2 Non hot plug PCI slot 3 Hot plug PCI slot 4 Fan bay ...
Страница 62: ...2 32 This page is intentionally left blank ...
Страница 199: ...6 23 Linux Enter the following command to start the program cd usr BmcOnlineUpdate BmcOnlineUpdate ...
Страница 201: ...6 25 Windows 2000 1 Select Setting Control Panel Add or Remove Programs 2 Click BmcOnlineUpdate ...
Страница 266: ...8 56 This page is intentionally left blank ...
Страница 336: ...B 6 This page is intentionally left blank ...
Страница 362: ...E 12 This page is left intentionally blank ...
Страница 378: ...G 12 ...
Страница 397: ......
Страница 398: ... ...