![background image](http://html.mh-extra.com/html/nec/express-5800/express-5800_user-manual_251000197.webp)
Hardware
197
Remounting Server to Rack
Push the release levers on the rails on the sides of the server and clear the latched status to
remount the server to the rack. Be very careful not to catch your finger at this time.
1. Push the release levers on the rails on each side of the server and clear the latched status.
2. Insert this sever into the rack.
3. Tighten four screws on each font end of the server and loosened in step 3 of
“Pulling Out
Server from Rack.”
4. Uninstall the stabilizer that was mounted to the bottom front of the rack.
5. Clear the maintenance mode set in step 1 of
“Pulling Out Server from Rack.”
Release Lever
Содержание Express 5800
Страница 73: ...73 Memo ...
Страница 279: ...Hardware 279 3 BIOS Menu screen is displayed ...
Страница 336: ...Hardware 336 Display Screen for WebBIOS Physical Drives Property Screen for Universal RAIDUtility Physical Devices ...
Страница 339: ...Hardware 339 3 BIOS will start Select Save Exit then press Enter ...
Страница 365: ...Hardware 365 6 Select Home at the lower left of the screen and press Enter to go back to WebBIOS Home Menu ...
Страница 444: ...444 Part Number Part number FRU File ID FRU file ID Asset Tag Asset management tag ...
Страница 526: ...526 Then input User Name for Authentication and select Keyboard interactive Then input Password ...
Страница 573: ...573 Memo ...
Страница 583: ...Software 583 Memo ...
Страница 690: ...Operation and Maintenance 690 Memo ...
Страница 719: ...XXIX Memo ...