![Munters Farm P-XL Скачать руководство пользователя страница 42](http://html.mh-extra.com/html/munters/farm-p-xl/farm-p-xl_user-manual_1856887042.webp)
© Munters AB, 2015
42
•
Ventilation Level: Read-only.
•
Tunnel/Curtain/Vent/Attic: Set position for the tunnel curtain by level. If you have Static
Pressure in Tunnel turned on (
Control | Static Pressure | Help | Set
), this becomes the minimum
position for the tunnel inlet.
4.3.1
V
ENT
&
C
URTAIN
L
EVELS
H
ELP
|
S
ET
D
EFINITIONS
While viewing the Vent & Curtain
Levels menu: Press
HELP
, select SET, and press
ENTER
.
Curtains
•
Stop Fans, Curtain Move (total %): Commands controller to stop fans during curtain
movements when total of all curtains is less than the total percent set in this parameter. For
example, 3 curtains at 40% each total 120% for this parameter. Default: 30%
•
1
st
Day for 2
nd
Vent to Operate: Set the day the second vent begins operating. Default: 1.
NOTE:
You can set negative days.
•
1
st
Level for 2
nd
Vent to Operate: Set the level the second vent begins operating. Default: 1
Attic
•
Minimum Attic Temperature To Operate: Set the minimum temperature to activate the Attic
operation.
•
Operate Until Day: Set the last day for attic operation (broilers only).
•
Operate From/To Time: Set the time frame for attic operation.
NOTE:
If one of the above options is relevant, the Attic is enabled.
VENT & CURTAIN LEVELS
Level
Tunnel
Vent
1
2
3
4
5
6
7
8
9
10
0
0
0
0
0
0
0
0
0
0
15
15
15
15
15
15
15
15
15
15
SYSTEM PARAMETERS
CURTAINS
Stop Fans, Curt. Move (total %)
1st Day for 2nd Vent to Oper.
1st Level for 2nd Vent to Oper
ATTIC
Minimum Attic Temp. To Operate
Operate Until Day
Operate Until Level
Operate From Time
Operate To Time
Max Temperatur to Disable Attic
30
-2
1
75
10
10
0:00
0:00
100.0