Operation
GMW-25
3-5
3.1.2
Generator Operation through the ENI Monitor
This section details how to operate the GMW-25 Generator using the
ENI Monitor.
Turning on the generator
Before any of the various settings can be set, the generator should be
turned on.
1. Flip the AC mains switch up to the ON position, if it is not on
already. The terminal display should appear as follows:
Power Up Delay in effect, please wait
The display will clear then display the following
ENI MONITOR ON
Ensuring that the ENI Monitor has control
e
*
1. A prompt (
*
) should appear after a carriage return is entered. If the
unit is in remote mode, the terminal should not have control. A
question mark (
?
) should be returned at the terminal.
Selecting the mode of operation
Presently there are two modes of operation supported by the
generator. The choices are: FP for forward power leveling and LP for
load power leveling. They are not accessible through the front panel
and can only be changed through the ENI monitor.
Содержание GMW-25
Страница 4: ...This page intentionally left blank...
Страница 43: ...System Installation GMW 25 2 21 Safety Interlock Locations Rear View Figure 2 7...
Страница 96: ...Appendix B B 2 GMW 25 This page intentionally left blank...
Страница 98: ...Appendix C C 2 GMW 25 This page intentionally left blank...