System
Installation
GMW-25
2-1
Chapter 2
System Installation
2.1 Unpacking/Inspection
2.1.1 Mechanical
Inspection
If damage to the shipping carton is evident, request the carrier’s agent
be present when the unit is unpacked. Check for equipment damage
and inspect the cabinet and panels for dents and scratches.
2.1.2
Claim for Damage
Please notify MKS, ENI Products directly or your authorized MKS, ENI
Products’ representative if the product is mechanically damaged or
fails to meet specifications upon receipt. Retain our shipping carton
and packing material for the carrier's inspection, as well as for
subsequent use to return the unit should this become necessary.
2.1.3
Packaging for Reshipment
Whenever possible, the original shipping carton and packing material
should be used for reshipment. If the original packing material is not
available, wrap the instrument in heavy paper or plastic. Use a strong
shipping container. If a cardboard carton is used, it should be at least
200-lb. test material.
Use shock-absorbing material around all sides of the instrument to
provide a firm cushion and to prevent movement inside the container
wall on each side. Protect the front panel by means of cardboard
spacers inserted between the front panel and the shipping carton.
Make sure that the instrument cannot move in the container during
shipping. Seal the carton with a good grade of shipping tape and mark
the container:
FRAGILE! ELECTRONIC INSTRUMENT
Drain water before shipment.
Содержание GMW-25
Страница 4: ...This page intentionally left blank...
Страница 43: ...System Installation GMW 25 2 21 Safety Interlock Locations Rear View Figure 2 7...
Страница 96: ...Appendix B B 2 GMW 25 This page intentionally left blank...
Страница 98: ...Appendix C C 2 GMW 25 This page intentionally left blank...