12. CONNECTION TO TOSHIBA PLC
12.2 Serial Connection
12 - 5
9
CONN
E
C
TION
T
O
S
H
ARP PLC
10
C
O
NN
ECTI
ON
T
O
SHI
N
KO
TECHN
OS IN
DIC
ATI
NG
C
O
NT
ROLLE
R
11
CONNECTION T
O
CH
INO
CONTROLLE
R
12
CONNECTION T
O
T
O
SHI
B
A
PL
C
13
CONNECTION T
O
T
O
SH
IB
A M
A
C
H
IN
E
PLC
14
CONNECTION T
O
P
A
NA
SONIC S
E
R
V
O
A
M
PL
IF
IE
R
15
CONNE
CTION T
O
PA
NA
SONIC
INDUSTRI
AL
DE
VI
CES
SU
NX
PLC
12.2.3 Connection Diagram
The following diagram shows the connection between the
GOT and the PLC.
RS-232 cable
(1) Connection diagram
RS232 connection diagram 1)
*1
GT16: CD, GT15: CD, GT14:NC, GT12:NC, GT11: NC
RS232 connection diagram 2)
*1
GT16: CD, GT15: CD, GT14:NC, GT12:NC, GT11: NC
(2) Precautions when preparing a cable
(a) Cable length
The length of the RS-232 cable must be 15m or
less.
(b) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(c) TOSHIBA PLC side connector
Use the connector compatible with the TOSHIBA
PLC.
For details, refer to the TOSHIBA PLC user's
manual.
RS-422 cable
(1) Connection diagram
RS422 connection diagram 1)
RS422 connection diagram 2)
GOT side
TOSHIBA PLC side
CD/NC
*1
RD(RXD)
SD(TXD)
ER(DTR)
SG
DR(DSR)
RS(RTS)
CS(CTS)
-
1
2
3
4
5
6
7
8
9
1
3
2
4
5
6
7
8
9
SG
TXD
RXD
-
SG
5V
RTS
-
5V
GOT side
TOSHIBA PLC side
CD/NC
*1
RD(RXD)
SD(TXD)
ER(DTR)
SG
DR(DSR)
RS(RTS)
CS(CTS)
-
1
2
3
4
5
6
7
8
9
1
5
12
7
8
15
6
14
13
-
TXD
RXD
SG
SG
SG
RTS
CTS
-
SDA1(TXD1+)
SDB1(TXD1-)
RDA1(RXD1+)
RDB1(RXD1-)
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDB2(RXD2-)
RSA(RTS+)
RSB(RTS-)
CSA(CTS+)
CSB(CTS-)
SG
NC
RXA
RXB
TXA
TXB
FG
CTSA
RTSA
CTSB
RTSB
SG
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Shell
2
10
3
11
1
4
5
8
9
6
12
13
7
14
15
TOSHIBA PLC side
GOT side
R
SDA1(TXD1+)
SDB1(TXD1-)
RDA1(RXD1+)
RDB1(RXD1-)
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDB2(RXD2-)
RSA(RTS+)
RSB(RTS-)
CSA(CTS+)
CSB(CTS-)
SG
NC
RXA
RXB
TXA
TXB
SG
TERM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Shell
TOSHIBA PLC side
GOT side
Содержание GOT 1000 Series
Страница 2: ......
Страница 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Страница 78: ......
Страница 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Страница 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Страница 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Страница 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Страница 426: ...15 22 15 CONNECTION TO PANASONIC INDUSTRIAL DEVICES SUNX PLC 15 6 Device Range that Can Be Set ...
Страница 432: ...REVISIONS 3 ...
Страница 435: ......