1 - 8
1. PREPARATORY PROCEDURES FOR MONITORING
1.1 Setting the Communication Interface
(c) GT14
(d) GT12
Standard interface 4
(GOT built-in Ethernet interface)
Standard interface 3
(GOT built-in USB interface)
[Front view]]
[Rear view]
[Under view]
Standard interface 1
(GOT built-in RS-422 interface)
Standard interface 2
(GOT built-in RS-232 interface)
Standard interface 1
(GOT built-in RS-422 interface)
Standard interface 2
(GOT built-in RS-232 interface)
Standard interface 4
(GOT built-in Ethernet interface)
[Front view]
[Rear view]
Содержание GOT 1000 Series
Страница 2: ......
Страница 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Страница 78: ......
Страница 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Страница 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Страница 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Страница 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Страница 426: ...15 22 15 CONNECTION TO PANASONIC INDUSTRIAL DEVICES SUNX PLC 15 6 Device Range that Can Be Set ...
Страница 432: ...REVISIONS 3 ...
Страница 435: ......