4 - 20
4. CONNECTION TO OMRON PLC
4.2 Serial Connection
RS422 connection diagram 2)
(For GT16)
RS422 connection diagram 3)
(For GT16)
RS422 connection diagram 4)
(For GT16)
RS422 connection diagram 5)
(For GT16, GT15, GT14, GT12, GT11, GT105 , GT104 )
GOT side
OMRON PLC side
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Shell
1
6
5
9
3
-
SDA1(TXD1+)
SDB1(TXD1-)
RDA1(RXD1+)
RDB1(RXD1-)
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDB2(RXD2-)
RSA(RTS+)
RSB(RTS-)
CSA(CTS+)
CSB(CTS-)
SG
NC
RDB
RDA
SDB
SDA
SG
FG
GOT side
OMRON PLC side
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Shell
8
6
2
1
-
SDA1(TXD1+)
SDB1(TXD1-)
RDA1(RXD1+)
RDB1(RXD1-)
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDB2(RXD2-)
RSA(RTS+)
RSB(RTS-)
CSA(CTS+)
CSB(CTS-)
SG
NC
RDB
RDA
SDB
SDA
FG
GOT side
OMRON PLC side
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Shell
SDA1(TXD1+)
SDB1(TXD1-)
RDA1(RXD1+)
RDB1(RXD1-)
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDB2(RXD2-)
RSA(RTS+)
RSB(RTS-)
CSA(CTS+)
CSB(CTS-)
SG
NC
RDB+
RDA-
SDB+
SDA-
FG
GOT side
OMRON PLC side
1
6
2
7
3
4
5
8
9
-
8
6
2
1
4
5
SDA
SDB
RDA
RDB
RSA
CSA
SG
RSB
CSB
FG
RDB
RDA
SDB
SDA
RS
CS
Содержание GOT 1000 Series
Страница 2: ......
Страница 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Страница 78: ......
Страница 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Страница 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Страница 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Страница 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Страница 426: ...15 22 15 CONNECTION TO PANASONIC INDUSTRIAL DEVICES SUNX PLC 15 6 Device Range that Can Be Set ...
Страница 432: ...REVISIONS 3 ...
Страница 435: ......