1
1
P
R
EP
ARA
T
OR
Y
P
R
OCEDURES
FOR
MONIT
O
R
ING
2
C
O
NNECTION T
O
IAI
ROBO
T
CO
N
T
RO
L
L
E
R
3
CONNECTION T
O
AZBI
L C
O
NTR
O
L
EQUI
PMENT
4
CONNECTION T
O
OMRON PLC
5
CONNECTI
O
N T
O
OMRO
N TEMPERA
TURE
CONTROL
LE
R
6
CONNECTION T
O
KE
YENCE PL
C
7
CONNE
C
T
ION T
O
KO
YO
EI
PLC
8
CONN
E
CT
ION T
O
JT
EK
T PL
C
1 - 1
1.
PREPARATORY PROCEDURES
FOR MONITORING
1.1 Setting the Communication Interface . . . . . . . . . . . . . . . . . . 1 - 3
1.2 Writing the Project Data and OS onto the GOT . . . . . . . . . 1 - 14
1.3 Option Devices for the Respective Connection . . . . . . . . . 1 - 16
1.4 Connection Cables for the Respective Connection . . . . . . 1 - 25
1.5 Verifying GOT Recognizes Connected Equipment . . . . . . 1 - 33
1.6 Checking for Normal Monitoring. . . . . . . . . . . . . . . . . . . . . 1 - 38
Содержание GOT 1000 Series
Страница 2: ......
Страница 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Страница 78: ......
Страница 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Страница 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Страница 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Страница 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Страница 426: ...15 22 15 CONNECTION TO PANASONIC INDUSTRIAL DEVICES SUNX PLC 15 6 Device Range that Can Be Set ...
Страница 432: ...REVISIONS 3 ...
Страница 435: ......