
Troubleshooting
DVVA II 4000
9-4
400-42803-01 (Rev B) - July 2017
Full Power-On Procedure
The power-on procedure is to be performed after the instrument has been shut down for an
extended period of time or after a loss of power.
1. Make sure the instrument and computer are in the following state before continuing:
a. Computer is turned OFF.
b. The instrument
MAIN POWER
switch (on back panel) is in the OFF position.
c. The instrument
Power
switch on the front panel is in the OFF position.
d. The USB cable is disconnected from the instrument.
2. Place the instrument
MAIN POWER
switch on the back panel to the ON position.
3. Connect the USB cable to the instrument.
4. Turn on the computer.
5. If required, allow Windows to install the drivers for any new hardware found. Refer to
“Power-On Troubleshooting” on page 9-6.
6. Place the instrument front panel
Power
switch in the ON position.
7. Start the DVVA II 4000 software.
Содержание DVVA II 4000
Страница 1: ...DVVA II 4000 Dynamic Void Volume Analyzer Operator s Manual Rev B 400 42803 01 July 2017 ...
Страница 4: ......
Страница 10: ...Table of Contents DV VA II 4000 vi 400 42803 01 Rev B July 2017 ...
Страница 16: ......
Страница 32: ......
Страница 116: ......
Страница 136: ......
Страница 160: ......
Страница 180: ......
Страница 212: ......
Страница 214: ......
Страница 240: ......
Страница 246: ......
Страница 248: ......