214685
18
Revision A
Figure 3.4: Double-Reel Center Arm
2.
Remove two top bolts (A) on center reel arm to allow
the center reel arm to move.
Figure 3.5: Reel Right End
3.
Position sling (A) around the reel tube (B) close to the
outboard end of reel and attach sling to a forklift (or
equivalent).
4.
Remove shipping wire/banding from the reel lift cylinder
that is secured to the reel right arm.
Содержание FlexDraper FD1 Series
Страница 2: ...FD1 Series FlexDraper Header Published June 2018...
Страница 12: ......
Страница 42: ......
Страница 45: ...214685 33 Revision A Figure 4 6 Filler Cap 10 Install filler cap A SETTING UP FLOAT MODULE...
Страница 72: ......
Страница 116: ......
Страница 153: ...214685 141 Revision A Figure 6 66 Deck Support Locations Left Shown Right Opposite PERFORMING PREDELIVERY CHECKS...
Страница 166: ......
Страница 336: ......
Страница 350: ......
Страница 353: ......