
4
Configuring the I/O system in the »PLC Designer«
4.3
Mapping the real station structure in the »PLC Designer«
71
Lenze · I/O system 1000 · Reference Manual · DMS 5.0 EN · 09/2016 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Configuring counter 1
17. Double-click the "EPM_S601_Counter_2xDC24V" device in the
device view
to open its
settings.
18. Go to the
Modules
tab and select the"Direction (pulse at A and direction at B" entry in the
"Signal evaluation" table row for the counter 0:
Commissioning completion
19. Establish a connection to the control.
20. Load and start the application.
21. Enter a "4" as the new value in "Counter Control Word" and transfer it via
<Ctrl>
+
<F7>
key
combination to start the counting process.
• As soon as the value has been transmitted and a countable signal is applied at the
corresponding input, the counter starts to count upwards.
• The value is transmitted cyclically via the CAN bus to the control.