![Krone BiG Pack 870 HDP XC Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/krone/big-pack-870-hdp-xc/big-pack-870-hdp-xc_original-operating-instructions_2004796098.webp)
9
Operation
9.8
Threading the upper twine
98
BiG Pack 870 HDP XC
Original Operating Instructions 150000760_00_en
Guiding the upper twine from the upper twine guide to the upper needles
Release the twine brake (9).
Guide the 3 upper twines (1, 2, 3) coming from the upper twine guide (7) through the rear
eyes (8) and attach them on the brake rolls.
Rotate brake rolls manually. In this process, the upper twine is guided through the brake
rolls.
BP000-114
Guide the upper twine from the twine brake (9) through the eye (10) of the tensioning arm
(11).
Pull the upper twine towards the bottom and guide it between the rolls (12) of the upper
needle (13).
Guide the other upper twines such as the first upper twine from the twine brake further to the
upper needle.
Æ
The next and final step for threading the upper twine depends on whether the bale channel
is empty or filled.
Right-hand machine side
Then guide the upper twine from the twine box further to the upper twine guide.
BP000-122
Make sure that the upper twines never cross over each other.
Guide the two upper twines (4, 5) coming from the twine box (6) further to the twine guide
(7).
Guide the two lower twines (4, 5) through the eyes of the upper twine guide (7) and guide
them further to the twine brakes at the knotters.