![Krone BiG Pack 870 HDP XC Скачать руководство пользователя страница 106](http://html1.mh-extra.com/html/krone/big-pack-870-hdp-xc/big-pack-870-hdp-xc_original-operating-instructions_2004796106.webp)
9
Operation
9.13
Operating the bale ejector
106
BiG Pack 870 HDP XC
Original Operating Instructions 150000760_00_en
Moving bale ejector backwards
With the safety sleeve (4) tightened, move the lever (5) to position (II) and hold it until the
bale ejector has moved backwards.
When the big bale has been ejected, move the bale ejector back to the front.
Close the stop cocks (2) and (3).
Moving bale ejector forwards
With the safety sleeve (4) tightened, move the lever (5) upwards to position (I) and hold it
until the bale ejector has moved completely to the very front.
Move the bale ejector backwards/forwards until the bale channel is empty.
Close the stop cocks (2) and (3).
For “Comfort 1.0” version
Via terminal
BP000-137
ü
.
Switch off the PTO shaft and wait until trailing machine parts have come to a complete stop.
Secure tractor against rolling away.
Apply the parking brake (
) and the flywheel brake (
) of the
machine.
Without “Load Sensing” version:
Actuate the control unit (
).
The key
has several functions.
If baling flaps have not been released
Press
in order to release the baling flaps.