![Krone BiG Pack 870 HDP XC Скачать руководство пользователя страница 88](http://html1.mh-extra.com/html/krone/big-pack-870-hdp-xc/big-pack-870-hdp-xc_original-operating-instructions_2004796088.webp)
9
Operation
9.1
Preparation for baling process
88
BiG Pack 870 HDP XC
Original Operating Instructions 150000760_00_en
9
Operation
WARNING
Risk of injury due to non-observance of relevant safety instructions
If the relevant safety instructions are not observed, persons may be seriously injured or killed.
To avoid accidents, the relevant safety instructions must be read and observed,
WARNING
Risk of injury due to non-observance of safety instructions
If the relevant safety routines are not observed, persons may be seriously injured or killed.
The safety routines must be read and observed to avoid accidents,
.
9.1
Preparation for baling process
Before starting baling process
ü
The correct cutting length is set,
ü
The bale ejector is in front position (for “Comfort 1.0” version):
).
ü
For "bale scale" version:
The bale brake is locked,
ü
Twine reserves are sufficent.
ü
The working height of the pick-up is set,
.
ü
The bale length is set correctly,
ü
The target baling flap pressure is set
ü
The knotter shaft is unlocked
ü
The flywheel brake is released,
ü
For “self-steering axle” version and “Medium 1.0” version:
The stop cock for the self-
steering axle is open,
.
Lower the bale chute into working position (for “Medium 1.0” version):
).
Lower pick-up into working position,
Baling process
ü
The conditions in “Before baling process” are fulfilled.
Turn on the PTO shaft at minimum speed.
Slowly increase the PTO speed to 1000 rpm.
Wait until the pre-selected target bale channel flap pressure is reached in the terminal
before driving up into the swath for the first time,
.