HANDLING THE QUICK HITCH OPERATION SWITCH
When the front attachment is installed, make sure
that the operation switch is in the "LOCK" side
before starting the engine.
LOCK
UNLOCK
8.6.3 BASIC COMPONENTS OF THE MACHINE
9
4
6
1
2
3
7
6
5
10
8 12
11
Item
Name
Item
Name
1
Movable hook
7
Cylinder
2
Fixed hook
8
Relief valve
3
Lock plate
9
Bucket link
4
Link connecting pin
10
Arm
5
Arm connecting pin
11
Holding spring
6
Cylinder pin
12
Hydraulic hose
[
8. OPTIONAL EQUIPMENT
]
8-
40
Copyright©2019 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PS00017ZE08] [1226CsCshWbYs]
Содержание SK55SRX-6
Страница 2: ...Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...
Страница 10: ...CONTENTS 8 Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...
Страница 142: ...4 MAINTENANCE 4 2 Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...