4.18 2000 HOUR INSPECTION & MAINTENANCE PROCEDURES
Thoroughly read and understand "1. SAFETY PRECAUTIONS" of this manual before performing the
inspection and maintenance.
Follow this section together with daily, 50-hour, 250-hour, 500-hour, 1000-hour and 1500-hour inspection
and maintenance.
4.18.1 OIL CHANGE IN TRAVEL REDUCTION UNITS
HANDLING OF OIL IMMEDIATELY AFTER OPERATION
•Oil is hot immediately after travel. Start working after the temperature is cooled down.
•If there is residual pressure in the travel motor, oil may gush out and the plug may pop out. Slowly
loosen the plug to release the inside pressure.
Replace the engine oil after 500 hours of operation for the first time.
Changing oil quantity 0.8 L (0.21 gal)
Drain oil container
1.0 L (0.26 gal.) or more
Replace the engine oil after 500 hours of operation for the first time.
1. Position the machine directing drain plug (1)
downward and stop the engine.
2. Remove drain plug (1), level plug (2) and fill
plug (3) and drain oil in the container.
3. After draining the oil completely, attach drain
plug (1) in place.
4. Fill with the specified oil in the specified
quantity through the hole for fill plug (3) until
the oil overflows from level plug (2) referring
to "LUBRICANT, FUEL & COOLANT
SPECIFICATIONS" in Chapter 4.
5. Attach level plug (2) and fill plug (3).
6. Similarly, change the oil of the travel
reduction unit on the other side.
GL
3
3
2
1
1
2
•Check the drained oil, and if metal chips or powder is found in the oil, contact our authorized
dealer/distributor.
•Dispose of the drained waste oil properly as the industrial waste.
[
4. MAINTENANCE
]
4-
66
Copyright©2019 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PS00017ZE08] [1226CsCshWbYs]
Содержание SK55SRX-6
Страница 2: ...Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...
Страница 10: ...CONTENTS 8 Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...
Страница 142: ...4 MAINTENANCE 4 2 Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...