3.9 MACHINE OPERATION
The machine operation procedures described below provide operators with basics which should be
learned thoroughly. You can further improve your operational skill by totally understanding the
performance and structure of this machine.
3.9.1 MACHINE TRAVEL
•Confirm the travel motor position before traveling. When the travel motor is positioned on the front
side, the traveling operation reverses.
•Sound the horn to warn persons in the working site.
•Keep the machine and its attachment at a safe distance from surrounding persons or facilities before
moving them.
When abnormality was detected in operation, stop the machine immediately and investigate the cause
of abnormality to take proper measures.
Forward/Reverse Travel
1. Move the pilot control shut-off lever to
"UNLOCKED position (A)" and keep the
bucket at a height of 30 to 40 cm (12 to 16
inch) above the ground.
2. Pull the dozer control lever to raise the
dozer.
3. To travel the machine forward, push both the
right and left travel levers forward. To travel
the machine backward, pull both the levers
back.
Both the forward and reverse travel speed
can be changed by how far you push or pull
the levers.
A
FOR
FORW
WARD
ARD
FOR
FORW
WARD
ARD
REVERSE
REVERSE
REVERSE
REVERSE
FORWARD
FORWARD
REVERSE
REVERSE
Forward/Reverse Travel
[
3. MACHINE OPERATION
]
3-
24
Copyright©2019 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2PS00017ZE08] [1226CsCshWbYs]
Содержание SK55SRX-6
Страница 2: ...Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...
Страница 10: ...CONTENTS 8 Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...
Страница 142: ...4 MAINTENANCE 4 2 Copyright 2019 Kobelco Construction Machinery Co Ltd All rights reserved S2PS00017ZE08 1226CsCshWbYs...