9-10
[
A,B
DB
M
A
B
M
P A
P B
IP
P R
DB
P R
Two lifting e ye s M12
De pth of thre a d 24(0.94")
Tota l lifting loa d of
two lifting e ye s is
2160 N (486 lbf)
(whe n ve rtica lly
lifting jig is us e d)
3.
Attach the connector of a proper size for the
hydraulic hand pump to the PR port of the swing
motor and connect the PR port with the hydraulic
hand pump.
4.
Apply the pressure of 2.8MPa (406psi) to the port by
the hydraulic hand pump to release the swing brake.
Symbol
Name
Size
Torque
N·m (lbf·ft)
A, B
Main port
2–PF1/2
108 (80)
M
Make-up port
PF3/4
167 (123)
DB
Drain port
PF3/8
74 (55)
PR
Break release port
PF1/4
36 (27)
IP
Gear oil filler port
PF3/4
98 (72)
PA, PB
Pressure measurement port
PF1/4
36 (27)
5.
Hang the wire rope on the arm end.
Copyright©2020 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2YY00041ZE03] [0701CsCshWbYs]