108
PLZ-4WH
Performing Parallel Operation
Ending parallel operation
To end parallel operation and return to independent operation, turn all the units off, and then
remove the flat cables.
To return a slave unit to independent operation, from the menu, select “2.Configuration” >
“1.Master/Slave” > “Operation” > “MASTER,” and then restart the unit.
To return a master unit that was connected to boosters to independent operation, from the
menu, select “2.Configuration” > “1.Master/Slave” > “Booster” > “-,” and then restart the unit.
CAUTION
To avoid damaging the product, observe the following precautions. Do not operate the PLZ-
4WH alone with the flat cable connected.
Содержание PLZ1004WH
Страница 13: ...Installation and Preparation This chapter describes how to unpack and prepare this product before you use it 1 ...
Страница 28: ...28 PLZ 4WH Remote Sensing ...
Страница 29: ...Basic Functions This chapter explains the operations for each operation mode and other basic functions 2 ...
Страница 47: ...Advanced Operations This chapter explains ABC preset memory setup memory protection functions and the menu 3 ...
Страница 61: ...Sequences This chapter explains the sequence function Sequences 4 ...
Страница 83: ...External Control and Parallel Operation This chapter explains external control and Parallel Operation 5 ...
Страница 115: ...Maintenance This chapter describes the maintenance procedures including cleaning inspection and calibration 7 ...
Страница 127: ...8 Specifications This chapter contains the specifications and gives the dimensions of the PLZ 4WH ...
Страница 137: ...Appendix A Operating Area B Sequence Program Creation Table C Options ...