Load management program
48 / 156
Power control
Power control action:
Defines, whether the Charge Point controls the level of power drawn by
the Electric Vehicle.
Display values:
No action
The Charge Point does not control the power levels drawn by the
Electric Vehicles connected to the Wallbox.
Only logging
The Charge Point logs, if an Electric Vehicle exceeds the assigned
power levels.
When outside global limits
The Charge Point disconnects an Electric Vehicle exceeding its as-
signed power levels, if the power used by all Electric Vehicles ex-
ceeds the power made available to the Charge Point.
Always
The Charge Point disconnects an Electric Vehicle if it exceeds the
assigned power levels.
Tolerance power control:
Level of current (in Ampere) by which the power must exceed the as-
signed power level before the power control takes action.
Max excess count
ISO 15118:
Maximum number of measurements at which the assigned power level
must be exceeded during charging control using high-level communica-
tion, before power control takes action.
Max excess count low-level:
Maximum number of measurements at which the assigned power level
must be exceeded during Mode 3 charging, before power control takes
action.
History repeated violations:
Indicates if multiple session history entries will be written if an Electric
Vehicle exceeds the assigned power level multiple times or if a session
history entry will only be written the first time.
Содержание KeContact Series
Страница 1: ...KeContact Load Management System manual...
Страница 151: ...Appendix 151 156 7 3 Data sheet power supply TDK Lambda DPP50 Dimensions...
Страница 152: ...Appendix 152 156...
Страница 156: ......