
Compressed air flow
rate
1)
[cfm]
Line cross-section ["]
< 350
3/4
350 – 705
1
706 – 1410
1 1/2
> 1410
2
1)
Compressed air flow rate as guide for the condensate volume to be expected
Tab. 29 Condensate collecting line: Line diameter
Fig. 25 Connecting the condensate drain
1
Threaded connection
2
Condensate line
3
Condensate collecting line
4
Screw plug
5
Shut-off valve
A
Delivery head
B
Length of the condensate collecting line
➤ Directly connect every condensate drain to the condensate collecting line.
➤ Collect the condensate in a suitable container and dispose of it in accordance with appli‐
cable environmental regulations.
Further information The dimensional drawing in chapter 13.1 provides the size and position of the connection port.
6.5 Connecting the machine to the power supply
Precondition The power supply disconnecting device is switched off,
lock out and tag out the device,
the absence of any voltage has been verified.
1. The power supply must only be connected by authorized installation personnel or an author‐
ized electrician.
2. Carry out safety measures as stipulated in relevant regulations and in national accident pre‐
vention regulations. In addition, observe the regulations of the local electricity supplier.
3. Test the overload protection cut-out to ensure that the time it takes to disconnect in response
to a fault is within the permitted limit.
6
Installation
6.5
Connecting the machine to the power supply
No.: 901760 02 USE
Operator Manual Refrigerated Dryer
TG
45
Содержание TG 450
Страница 2: ...Original instructions KKW DTG 2 02 en Z1 SBA TROCKNER 20221118 115620...
Страница 6: ...Contents iv Operator Manual Refrigerated Dryer TG No 901760 02 USE...
Страница 8: ...List of Illustrations vi Operator Manual Refrigerated Dryer TG No 901760 02 USE...
Страница 10: ...List of Tables viii Operator Manual Refrigerated Dryer TG No 901760 02 USE...