Revision 01
07/97
U.K. PRESSURE SYSTEM REGULATIONS – FINAL IMPLEMENTATION 1 JULY 1994
COMPONENT
CURRENT INFORMATION
REVISED INFORMATION
COMMENT
Pressure vessel.
F59 form (U.K. only)
As required, detailed
examination by local / national
legislation.
As required, detailed
examination by local / national
legislation.
1 year – Fully inspect all
external surfaces, welds and
fittings;
.
report any excessive
corrosion, mechanical
or impact damage.
.
report any leakage or
other deterioration.
6 year – Remove lid and any
necessary fittings.
.
Fully clean out.
.
Fully inspect all internal
surfaces and welds.
F59 regulation ended 1 July
1994.
Change.
Not applicable to this
compressor unless for special
order.
Pressure gauge.
2 year – Remove and
calibrate.
1 year – Remove and
calibrate.
Not applicable to this
compressor
Pressure regulator.
–
1 year – Check correct
function.
Not applicable to this
compressor
Filters, valves and hoses.
6 months
–
No change (Maximum
recommended 1 year).
Pressure relief valve.
2 year – Remove and
calibrate.
–
No change.
High air temperature switch
and system.
1 year – Function calibration
test.
–
No change.