NO TICE
Knock the expansion bolts into the holes until the expansion sleeves completely fit
into the holes. The expansion sleeves must be completely buried under the ground
to facilitate subsequent installation.
Figure 6-33 Drilling holes and installing expansion sleeves
(1) M12 bolt
(2) Spring washer
(3) Flat washer
(4) Expansion sleeve
(5) Expansion nut
(6) Concrete floor
Step 3 Secure the cabinets.
Figure 6-34 Securing the cabinets
Step 4 Install anchor baffle plates.
UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
6 Installation
Issue 02 (2021-04-22)
Copyright © Huawei Technologies Co., Ltd.
85