No.
Item
Acceptance Criteria
02
Neat arrangement
The UPS and its adjacent cabinets are
neatly arranged and secured with
connecting kits.
03
Layout of the busway and
cables
The busway and cables are routed
properly as required by the customer.
04
Labels on the busway and
cables
Both ends of a busway and cable are
labeled. Labels are concise and easy to
understand.
05
Cable ties
Cable ties are secured evenly and no burr
exists.
06
Cable and busbar
connections
Input power cables or busbars, output
power cables or busbars, and cables
between batteries are securely
connected. For the cables secured by
screws, the spring washers are flattened.
07
Grounding
The resistance between the UPS ground
bar and the equipment room ground bar
is less than 0.1 ohm.
08
AC phase sequence
The mains input, bypass input, and
output phase sequences are correct.
09
Battery cable connections
The battery strings are correctly
connected to the UPS.
10
Foreign matter cleaning
inside the cabinets
The inside and outside of the cabinets
are free from conductive dust or other
sundries.
1. There is no foreign matter (such as
copper wires and screws) on the top
of the cabinets.
2. There is no foreign matter on the
copper bar terminals.
3. There is no foreign matter around
switch terminals.
4. There is no foreign matter on the
bottom plates of the cabinets.
5. There is no foreign matter on the rear
module subrack.