NO TE
1. After routing cables and checking cable connections, use sealing putty to fill in all gaps
between the cables and the cabinets.
2. After verifying the installation, reinstall all the covers.
3. Do not remove the dustproof cover before power-on to prevent dust from entering the
cabinets.
UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
6 Installation
Issue 02 (2021-04-22)
Copyright © Huawei Technologies Co., Ltd.
105