Figure 6-42 Installing the SmartLi communications cable
----End
6.4.2 Installing the UPS + Bottom Cabling Cabinet
6.4.2.1 Installing Cabinets
Installation on the Floor
NO TICE
Ensure that the installation floor is flat.
Step 1 Determine the cabinet installation positions on the floor based on the holes in the
marking-off template for floor installation.
NO TE
● A: mounting holes on the channel steel
● B: mounting holes on the floor
UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
6 Installation
Issue 02 (2021-04-22)
Copyright © Huawei Technologies Co., Ltd.
90