2. Drill holes and install expansion sleeves.
3. Secure the cabinet to the floor.
4. Install anchor baffle plates.
Figure 6-10 Installing the cabinet
----End
Installation on Channel Steel
NO TICE
● Huawei does not provide channel steel or expansion bolts for securing channel
steel. Customers need to purchase them by themselves.
● Ensure that the surface of channel steel is level.
● The procedure for installation on channel steel is similar to that for installation
on the floor except the following steps:
●
Determine the mounting holes for the cabinet based on the marking-off
template (for installation on channel steel).
●
Drill mounting holes on the channel steel using a hammer drill.
●
Use M12x60 bolts to secure the cabinet on the channel steel.
UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
6 Installation
Issue 02 (2021-04-22)
Copyright © Huawei Technologies Co., Ltd.