Figure 6-13 Installing ground cables
(1) Ground bar in the equipment room
Step 3 Install power cables.
NO TE
Cables of the same group, for example, mains input cables, must be routed through the
same cable hole.
●
One power source
Figure 6-14 Installing cables
(1) Wiring terminal
(2) Spring washer
(3) Bolt
UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
6 Installation
Issue 02 (2021-04-22)