4-26
Engine Servicing
(1) DOWEL PINS (2) NEW GASKET
(1) WATER PUMP COVER
(2) SEALING WASHER/BOLT
(3) BOLTS (4) LOWER RADIATOR HOSE
Install the water pump cover, sealing washer and
cover bolts.
Tighten the cover bolts in a crisscross pattern in 2-3
steps.
Connect the lower radiator hose and tighten the
hose band screw.
Pour specified transmission oil (page 3-10).
Fill the cooling system and bleed the air (page 1-1).
(1) WATER PUMP SHAFT/GEAR
(2) NEW COPPER WASHER
(3) IMPELLER
Install the water pump shaft and new copper wash-
er to the right crankcase cover.
Hold the water pump gear using a suitable tool, then
install and tighten the impeller to the specified
torque.
Be careful, the water pump impeller has left hand
threads.
Torque: 12 N•m (1.2 kgf•m, 9 lbf•ft)
Install the right crankcase cover (page 4-51).
Install the dowel pins and new water pump cover
gasket.
(2)
(3)
(1)
(4)
(2)
(3)
(1)
(1)
(2)
Содержание NSF250R 2012
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 10: ...Memo ...
Страница 18: ...Memo ...
Страница 39: ...2 21 Service Data REAR BRAKE HOSE REAR BRAKE RESERVOIR HOSE ...
Страница 40: ...Memo ...
Страница 66: ...3 26 Service and Maintenance 1 OIL LINE PLUG BOLT A 1 OIL LINE PLUG BOLT B 1 1 1 1 OIL FILTER COVER BOLTS ...
Страница 150: ...Memo ...
Страница 192: ...Memo ...
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......