(1) DOWEL PINS
Install the dowel pins.
4-62
Engine Servicing
(1) SHIFT DRUM CENTER PIN
(2) CENTER PIN
Apply a locking agent to the shift drum center pin
threads.
Tighten the center pin to the specified torque.
Torque: 22 N•m (2.2 kgf•m, 16 lbf•ft)
(1) SHIFTER COLLAR
(2) GUIDE PLATE/SHIFT DRUM ASSEMBLY
(3) BOLTS
Place the shift drum center position other than neu-
tral.
Hold the ratchet pawls in the drum shifter, install the
guide plate/ratchet pawl assembly into the shift
drum center.
Apply a locking agent to the guide plate bolt
threads.
Install and tighten the guide plate bolts to the spec-
ified torque.
Torque: 10 N•m (1.0 kgf•m, 7 lbf•ft)
Apply transmission oil to the shifter collar sliding
surface.
Install the shifter collar to the drum shifter.
(1)
(2)
(1)
(3)
(2)
(1)
Содержание NSF250R 2012
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 10: ...Memo ...
Страница 18: ...Memo ...
Страница 39: ...2 21 Service Data REAR BRAKE HOSE REAR BRAKE RESERVOIR HOSE ...
Страница 40: ...Memo ...
Страница 66: ...3 26 Service and Maintenance 1 OIL LINE PLUG BOLT A 1 OIL LINE PLUG BOLT B 1 1 1 1 OIL FILTER COVER BOLTS ...
Страница 150: ...Memo ...
Страница 192: ...Memo ...
Страница 297: ......
Страница 298: ......
Страница 299: ......
Страница 300: ......