
Hardware options installation 83
6.
Using a flat screwdriver, toggle the knockout to loosen it, and then pull it out of the chassis.
7.
Install the dedicated iLO management module.
8.
If removed, install the PCI riser cage and the expansion board.
9.
Install the access panel (on page
22
).
10.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack ("
Installing the server into the rack
" on page
30
).
11.
Power up the server (on page
17
).
12.
Enable the dedicated iLO connector ("
Enabling the dedicated iLO management module
" on page
84
).
Содержание ProLiant DL160 Gen9
Страница 92: ...Cabling 92 M 2 SSD cabling Slot 1 cable routing Slot 2 cable routing ...
Страница 94: ...Cabling 94 FBWC module slot 2 cabling FBWC module slot 3 cabling ...
Страница 95: ...Cabling 95 HP Smart Storage Battery cabling FlexibleLOM cabling ...
Страница 98: ...Cabling 98 Front I O cabling Front I O cabling in LFF configuration Front I O cabling in SFF configuration ...
Страница 99: ...Cabling 99 Front USB 3 0 cabling ...
Страница 129: ...Support and other resources 129 ...
Страница 130: ...Support and other resources 130 ...