Hardware options installation 77
o
Slot 1 (If slot 2 and 3 are both unavailable, install the the M.2 SSD enablement board in slot 1.)
8.
Install the PCI riser cage (on page
24
).
9.
Connect the SATA cables to the SATA connectors on the system board.
For cable routing, see "M.2 SSD SATA cabling".
10.
Install the access panel (on page
22
).
11.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack ("
Installing the server into the rack
" on page
30
).
12.
Power up the server (on page
17
).
Front USB 3.0 option
The front USB 3.0 option can only be installed in the eight-bay configuration.
Содержание ProLiant DL160 Gen9
Страница 92: ...Cabling 92 M 2 SSD cabling Slot 1 cable routing Slot 2 cable routing ...
Страница 94: ...Cabling 94 FBWC module slot 2 cabling FBWC module slot 3 cabling ...
Страница 95: ...Cabling 95 HP Smart Storage Battery cabling FlexibleLOM cabling ...
Страница 98: ...Cabling 98 Front I O cabling Front I O cabling in LFF configuration Front I O cabling in SFF configuration ...
Страница 99: ...Cabling 99 Front USB 3 0 cabling ...
Страница 129: ...Support and other resources 129 ...
Страница 130: ...Support and other resources 130 ...