Hardware options installation 45
7.
Connect the other end of the cache module cable to the PCIe riser board.
8.
Install the storage controller ("
Installing a storage controller
" on page
41
).
9.
Install the HP Smart Storage Battery:
a.
Disconnect the 24-pin power supply cable from the system board.
b.
Align the component and press down until it clicks in place.
c.
Connect the battery cable.
Содержание ProLiant DL160 Gen9
Страница 92: ...Cabling 92 M 2 SSD cabling Slot 1 cable routing Slot 2 cable routing ...
Страница 94: ...Cabling 94 FBWC module slot 2 cabling FBWC module slot 3 cabling ...
Страница 95: ...Cabling 95 HP Smart Storage Battery cabling FlexibleLOM cabling ...
Страница 98: ...Cabling 98 Front I O cabling Front I O cabling in LFF configuration Front I O cabling in SFF configuration ...
Страница 99: ...Cabling 99 Front USB 3 0 cabling ...
Страница 129: ...Support and other resources 129 ...
Страница 130: ...Support and other resources 130 ...