Hardware options installation 40
Installing a hot-plug drive
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless
all bays are populated with either a component or a blank.
To install the component:
1.
If installed, remove the security bezel ("
Remove the security bezel (optional)
" on page
21
).
2.
Remove the drive blank.
3.
Prepare the drive.
4.
Install the drive.
5.
Determine the status of the drive from the drive LED definitions ("
HP SmartDrive LED definitions
" on page
15
).
6.
If removed, install the security bezel ("
Security bezel option
" on page
37
).
Содержание ProLiant DL160 Gen9
Страница 92: ...Cabling 92 M 2 SSD cabling Slot 1 cable routing Slot 2 cable routing ...
Страница 94: ...Cabling 94 FBWC module slot 2 cabling FBWC module slot 3 cabling ...
Страница 95: ...Cabling 95 HP Smart Storage Battery cabling FlexibleLOM cabling ...
Страница 98: ...Cabling 98 Front I O cabling Front I O cabling in LFF configuration Front I O cabling in SFF configuration ...
Страница 99: ...Cabling 99 Front USB 3 0 cabling ...
Страница 129: ...Support and other resources 129 ...
Страница 130: ...Support and other resources 130 ...