Hardware options installation 74
o
Expansion board installation into slot 2
o
Expansion board installation into slot 3
9.
Connect all necessary internal cabling to the expansion board. For more information on these cabling
requirements, see the documentation that ships with the option.
10.
Install the PCI riser cage (on page
24
).
IMPORTANT:
The server does not power up if the PCI riser cage is not seated properly.
11.
Install the access panel (on page
22
).
12.
Install the server into the rack ("
Installing the server into the rack
" on page
30
).
13.
Power up the server (on page
17
).
M.2 SSD enablement option
To install the component:
1.
Power down the server (on page
17
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
Содержание ProLiant DL160 Gen9
Страница 92: ...Cabling 92 M 2 SSD cabling Slot 1 cable routing Slot 2 cable routing ...
Страница 94: ...Cabling 94 FBWC module slot 2 cabling FBWC module slot 3 cabling ...
Страница 95: ...Cabling 95 HP Smart Storage Battery cabling FlexibleLOM cabling ...
Страница 98: ...Cabling 98 Front I O cabling Front I O cabling in LFF configuration Front I O cabling in SFF configuration ...
Страница 99: ...Cabling 99 Front USB 3 0 cabling ...
Страница 129: ...Support and other resources 129 ...
Страница 130: ...Support and other resources 130 ...