
Hardware options installation 44
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
o
Extend the server from the rack (on page
17
).
o
Remove the server from the rack (on page
20
).
4.
Remove the access panel (on page
21
).
5.
Remove the PCI riser cage (on page
23
).
CAUTION:
When connecting or disconnecting the cache module cable, the connectors on the
cache module and cable are susceptible to damage. Avoid excessive force and use caution to
avoid damage to these connectors.
6.
If you intend to use an FBWC module, install the module on the storage controller. Depending on the
controller model, the cable connector on the cache module might be facing up or down when the
module is installed on the controller board.
a.
Connect the cache module backup power cable to the module.
b.
Install the cache module on the storage controller.
Содержание ProLiant DL160 Gen9
Страница 92: ...Cabling 92 M 2 SSD cabling Slot 1 cable routing Slot 2 cable routing ...
Страница 94: ...Cabling 94 FBWC module slot 2 cabling FBWC module slot 3 cabling ...
Страница 95: ...Cabling 95 HP Smart Storage Battery cabling FlexibleLOM cabling ...
Страница 98: ...Cabling 98 Front I O cabling Front I O cabling in LFF configuration Front I O cabling in SFF configuration ...
Страница 99: ...Cabling 99 Front USB 3 0 cabling ...
Страница 129: ...Support and other resources 129 ...
Страница 130: ...Support and other resources 130 ...