Operations 19
iii.
Slide the server out of the rack.
5.
After performing the installation or maintenance procedure, slide the server back into the rack, and then
press the server firmly into the rack to secure it in place.
6.
Do one of the following:
o
In a server that uses thumbscrew rack ears, tighten the captive thumbscrews.
o
In a server that uses quick-release latch rack ears, if necessary, tighten the shipping screws.
7.
Connect the peripheral cables.
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
Содержание ProLiant DL160 Gen9
Страница 92: ...Cabling 92 M 2 SSD cabling Slot 1 cable routing Slot 2 cable routing ...
Страница 94: ...Cabling 94 FBWC module slot 2 cabling FBWC module slot 3 cabling ...
Страница 95: ...Cabling 95 HP Smart Storage Battery cabling FlexibleLOM cabling ...
Страница 98: ...Cabling 98 Front I O cabling Front I O cabling in LFF configuration Front I O cabling in SFF configuration ...
Страница 99: ...Cabling 99 Front USB 3 0 cabling ...
Страница 129: ...Support and other resources 129 ...
Страница 130: ...Support and other resources 130 ...