Setup 33
b.
Bend the plug end of the power cord in the position shown in the following image.
c.
Secure the power cord in the hook-and-loop strap as shown in the following image.
5.
Employ best practices to route and manage the power cords and other cables in the server rear panel.
IMPORTANT:
When using cable management arm components, be sure to leave enough slack
in each of the cables to prevent damage to the cables when the server is extended from the rack.
6.
Use the hook-and-loop strap included in the server shipping carton to secure the power cords and the
other rear panel cables to the rack rail. For detailed instructions, see "Installing the rack rail
hook-and-loop strap (on page
34
)."
7.
Connect the power cord to the power source.
Содержание ProLiant DL160 Gen9
Страница 92: ...Cabling 92 M 2 SSD cabling Slot 1 cable routing Slot 2 cable routing ...
Страница 94: ...Cabling 94 FBWC module slot 2 cabling FBWC module slot 3 cabling ...
Страница 95: ...Cabling 95 HP Smart Storage Battery cabling FlexibleLOM cabling ...
Страница 98: ...Cabling 98 Front I O cabling Front I O cabling in LFF configuration Front I O cabling in SFF configuration ...
Страница 99: ...Cabling 99 Front USB 3 0 cabling ...
Страница 129: ...Support and other resources 129 ...
Страница 130: ...Support and other resources 130 ...