Manual Call Points
¨
Each
call point
should be tested for correct initiation of
a fire event.
Interface Units
&
1. In some instances it may not be possible to
functionally test input / output circuits off an
interface unit, such as when it is connected to plant
equipment.
2. Ensure the contact rating of interface output
circuits are adequate for the ancillary equipment
load requirement.
3. Fit a mains voltage warning label where mains
supply is being switched.
Ancillary equipment
¨
Tests should be carried out following customer
consent. It may also be necessary to obtain third party
consent.
¨
All tests on ancillary equipment should have been
agreed during the project design stage.
"
The loop powered single channel interface
output is not fault monitored, in this case the output tests
are not applicable.
Tests
¨
Each interface should be tested for the following:
•
Battery disconnection*
•
Mains supply disconnection*
•
Input line open circuit
•
Input line short circuit
•
Input line detector fire*
•
Input line MCP fire*#
•
Output line open circuit ~
•
Output line short circuit ~
•
Output line operation ~
* -
not applicable for the
loop powered interface units
, but input
tests are applicable to
loop powered zone module
.
# - a fire from a
manual call point or detector
connected to a
loop powered zone module input cannot be differentiated.
~ - the output of the
single channel interface
operates with
sector.
The output is a set of
voltage free contacts
which are
not fault monitored.
Interfaced equipment test
¨
The external equipment connected to the system via an
interface unit should be tested as per project
specification.
Keyswitches
¨
Where the interface unit has a keyswitch door fitted,
then the keyswitches should be configured for correct
operation and tested as per project specification.
¨
Check on operating the keyswitch the adjacent LED
will be lit.
S Cubed
"
The remote control is only operable when the
panel is in the zone Test mode (EN) / Commission mode
(BS).
¨
Depending on the type of S cubed device being
commissioned check to ensure correct output sound
tone, speech message and strobe rate are given. The
S-Cubed devices should have been setup using the
commissioning tool.
¨
The volume of the sounder S-Cubed device can be
adjusted by using a remote control.
¨
Each S-Cubed should be tested, for correct operation in
the event of fire.
¨
The sound levels in the areas should be tested in
accordance with the British Standard requirements and
to meet the site specific needs as agreed with the
customer.
Generic Commissioning instructions
64
4188-856_i2_12/06_Generic Vigilon (C VA) Comms.
Installed
e
quipment
tests
Thinned
section
on base
3m
-
m
aximum
range
Press the
function button to toggle between:
function and note the Red LED flashes
x2 every 2 seconds
Tone
Volume
function and note the Red LED flashes
x1 every 2 seconds
Press the
button to increase
or to select the next
Press the
button to decrease
or to select the previous
volume
tone
volume
tone
+
-
Wall
S unit
3
+
-
Red LED
Flash
Steady On
Perform a short press on the
Power button to turn On
the remote control. The Red LED will flash
x1 every 2 seconds
Off
Press and hold the
Power button to save the settings and adjustments.
The Red LED will remain On
whilst the button is held pressed.
The data is saved to the unit when the tone/speech on the S unit
stops briefly. Release the button on the remote control and the
Red LED will switch Off
.
3
Note:
The strobe light on the S unit if fitted will flash rapidly when the volume is being
adjusted using the remote control.
3
Remote Control
Trouble shooting
If the remote control fails to operate in close
proximity to the thinned section of the S
product, then a possible cause may be the
battery. Replace the battery.
3