
This kit may be required when installing a replacement PSU in
a Vigilon panel.
"
If upgrading to new earthing arrangement
the EMC cover part number 4094-290.01 will be required
and is available free of charge upon request from GENT
Sales.
&
Before working on the panel you must
first power down the mains and battery supply to
the panel.
Kit
This kit must be used to correctly wire the replacement PSU
No.
Qty
Back box spade connector to mains
input filter earth. Yellow/Green wire
1
Back box spade connector to PSU
earth. Yellow/Green wire
1
Mains filter to PSU live (brown) and
neutral (blue) wire loom
1
Spade connector
1
Cable tie
1
Primary earth label
1
Nut
1
Shake proof washer
3
"
The parts in the kits are used according to
the wiring arrangements.
Parts used
Parts used when converting the old earthing arrangement to
the new earthing arrangement:
Items required:
Parts used when converting the new earthing arrangement to
the old earthing arrangement:
Items required:
Wiring arrangements
Conversion kit 4188-823 issue 1_05/06
1
Installation instructions
Conversion kit
(2534-196)
for PSU wiring in Vigilon panel
by Honeywell
E
L
N
L
PSU Chassis
TE
PCB
L
E
N
N
L
N
L
PSU Chassis
TE
PCB
L
E
N
N
PSU with old
earthing arrangement
PSU with new
earthing arrangement
L
N
L
PSU Chassis
TE - Transformer Earth
PCE - PSU Chassis Earth
PCB
L
E
N
N
E
L
N
L
PSU Chassis
TE
PCB
L
E
N
N
PSU with New
earthing arrangement
PSU with old
earthing arrangement
Wiring arrangement
before replacing the PSU
Wiring arrangement
after replacing the PSU
Mains
Filter
Mains
Filter
Mains
Filter
Mains
Filter
Converting from the old earthing arrangement
TE
PCE
PCE
PCE
PCE
Converting from the new earthing arrangement
Wiring arrangement
before replacing the PSU
Wiring arrangement
after replacing the PSU