
Battery installation
VIG1-24 panel battery installation
VIG1-72 panel battery installation
4188-856_i2_12/06_Generic Vigilon (C VA) Comms.
21
Vigilon (EN & BS) Compact (VA) panels
new
V
igilon
4
/6
loop
Panels
TH-
TH+
BT2-
BT2+
BT1+
P4 P3
P2
P1
P6
TH1
BT1-
TH-
TH+
BT2-
BT2+
BT1+
P4 P3
P2
P1
P6
TH1
BT1-
In-line fuse rated 10A QB ceramic 20mm x 5mm
8 - 12V 21Ah batteries
Battery Box
A
B
Lower
shelf
A
B
Upper
shelf
4 - 12V 21Ah batteries
Battery Box
Upper
shelf
B
A
Lower
shelf
The panel will only power up after the mains supply
is switched
.
on
Route the battery red/black lead through hole in shelf
and connect to the respective connectors on PCB,
located on the top right side of the enclosure.
Add two more batteries 'B' to the lower shelf and repeat
procedures
to
.
j
n
Where required, add four batteries to the upper shelf,
follow procedures
to
. The only exception
is that the red/black lead is directly connected to the
respective upper connectors on the PCB.
j
o
Red
White.
Black
It is recommended that the mains supply is switched
during battery installation.
off
Fit the bolt, spade connector, washer and spring
washer to each battery terminal as shown above.
Place the two batteries in the lower shelf and lay them
horizontally with terminals facing outwards.
Fit the white link lead and then fit the red/black
fused lead to the battery terminals.
White.
Red
Black
Raise the two batteries to an upright position
and push them back into the enclosure.
Ensure the batteries are held in place while they
are being wired. Ensure the battery terminals
do not come into contact with the metal enclosure.
Black
Red
P20
BT+
BT
-
It is recommended that the mains supply is switched
during battery installation.
off
Fit the bolt, spade connector, washer, spring washer to
each battery terminal.
Insert
hand battery into the back box.
right
Fit the link lead (white) to outer + and - spade connectors
on the two batteries.
Fit the battery lead
assembly to inner + and
- spade connectors of the two batteries observing polarity.
(red & black)
Insert
hand battery into the back box.
left
Plug the battery connector into connector P20 located on
the bottom left of power supply PCB.
The panel will only power up after the mains supply
is switched on.
Red
Black
White
Black
Red