gaitway-3D Service manual
Ref.:TM-MAN-0005-ARS
Iss.: A
Rev.: 9
Date: 07/12/2020
Page : 94
Test Step
Measurements/Test Results
Seq.
No.
Description
Required/No
minal (incl.
tolerance)
Measured/
Calculated
Remarks/Calculations
Pass/
No
pass
31.
Screw the flat-support on the sensors.
Torque =
50Nm
1x DIN7991-M12x25
32.
While
the
treadmill
is
elevated
and
supported by two wheel boards, place the
two treadmill-supports under the treadmill.
Sensors 1 and 4 shall be placed at the left
side of the treadmill; sensors 2 and 3 shall
be placed at the right side of the treadmill.
Load cells are identified by the label at the
end of the cable.
Sensors 1&4:
LEFT side
Sensors 2&3:
RIGHT side